· The NXE-RF Touchpad with Receiver combines touchpad and receiver capabilities into a single device for use with all NetworX control panels except CF (commercial fire) panels. Note: When using this touchpad with an NX-8E, NX-8V2, NX-6V2, or NX-4V2 and downloading via modem, make sure the. GE NXE Manuals User Guides. Since all modules connected to the NX-8 are programmed through the keypad, the module you are programming should be the first entry. To program the NX-8 Control Panel, enter [0]-[#]. The [0] is the module number of the control and the [#] is the entry key. Other module entry numbers can be found in their corresponding manuals. PROGRAMMING A. NXE-RF LCD Touchpad w/Receiver Installation Instructions 2 9. Reattach the touchpad to the mounting plate by placing the top of the touchpad on the clips of the mounting plate and pushing the touchpad down into place. Replace the screw on the bottom of the touchpad. Apply power to the control panel. Programming.
CADDX PART # DESCRIPTION NX-4 KIT Includes NX-4 Control, NX LED Keypad, V 25VA Transformer NX-4 NX-4 Control Only NX 8 Zone LED Keypad NX 16 Zone LED Keypad NX 24 Zone LED Keypad NX Alphanumeric LCD Keypad NX ** Zone Doubling Kit (Includes k and k resistors) NX ** Smart Power Supply and Buss. NXE LED Keypad User's manual. Page 1 SECURITY SYSTEM NOTES Installing/Service Company _____ For Service Call _____ Central Station _____ Duress Code _____ FUNCTION CODES Function Code Controls Function This system is is not partitioned. EMERGENCY ACTIVATION KEYS. The GE Caddx Networx line of security systems offer many of the features of more complicated alarms, but at very reasonable prices. The 3 main panels are the GE NX-4, NX-6, and the NX The smallest is the NX-4, with 8 on-board zones. The largest panel is the Caddx NX-8, with 8-zones on-board, expandable to
GE NXE User Manual Operation user’s manual (30 pages) GE NetworX NX-4V2 Installation And Startup Installation and startup (48 pages) GE NXE - Caddx 8 Zone LED Keypad Installation Manual Installation manual (60 pages) GE AL User Manual Operation user’s manual (76 pages). NetworX NXE Receiver Installation Instructions 2 6. Align the bottom of the circuit board in the edge guide standoff and twist the st andoff into place (Figure 4). Tighten the mounting screw (Figure 2). Figure 4. Installing the circuit board External mounting This installation uses enclosure model NX (). Please refer to the current GE Interlogix product catalog for detailed warranty information. Main Technical Support Outside the US Tech Support Fax Main Fax Sales Literature Web: www.doorway.ru www.doorway.ru SAFETY SYMBOL LEGEND Warning.
0コメント